Changchun-Jilin Expressway

 
I. A Survey of the Project: Changchun-Jilin Expressway is the busiest section of Hunchun-Changchun Expressway, which is the artery of Tongjiang-Sanya National Highway. It is connected to Harbin-Changchun-Siping-Shenyang Expressway in the west. In the east it is connected to Jiangmifeng-Hunchun Expressway, which is under construction. It is also connected to Changchun Longjia International Airport at the point of 20 kilometer. It is the trunk line for the social and economic communication of the two cities: Changchun City and Jilin City, and the link between the air terminal and the two cities. The total length of Changchun-Jilin Expressway is 84 kilometers and the width of the roadbed is 34.5 meters. It was completed in 1997 with four lanes. In 2004 and 2005, the 20-kilometer section from Changchun City to Longjia International Airport was extended to six lanes. It is planned that the rest 64 kilometers from Longjia International Airport to Jilin City be extended to six lanes during "the eleventh five-year project". The traffic of this expressway will be increasingly busy with the revitalization of the old industrial bases in the Northeast, the operation of the airport and the completion of Jiangmifeng-Hunchun Expressway.

II. Mode of Cooperation: Transfer the right of toll collection and operation

III. Total investment of the Project: RMB 3 billion Yuan (including 0.5 billion Yuan investment for the planned extension to six lanes), equivalent to USD 0.375 billion (one US dollar for eight RMB Yuan). The value of the right of toll collection and operation is to be further assessed.

IV. The Expected Period of Investment Recovery: 30 years (since 2006)


Person to Contact: Zhu Jianfeng, Traffic Office of Jilin Province Tel: 0431-85097535 Fax: 0431-85653321
 

JILIN Provincial Communication Department

2006 All Right Reserved.