I. A Survey of the Project:
Changchun-Yingchengzi Expressway is a key section of Songjianghe-Shuangliao
Highway, which is one of the "horizontal lines" of the
Northeast network of trunk roads. It is the main line that connects
Changchun, capital of the province, to Changbai Mountain, Liaoyuan
City, Tonghua City, Baishan City and other southeast areas. It
is also the passage to Dadong Port in Dandong. The total length
of the expressway is 69 kilometers. It was completed in September
1997. This four-lane expressway is totally enclosed with overpasses.
The width of the roadbed is 24.5 meters. This project will be
increasingly profitable with the completions of Changchun-Changbai
Mountain Expressway, Liaoyuan-Yitong Expressway, and Yingchengzi-Dongfeng-Tonghua
Expressway and the formation of expressway network.
II. Mode of Cooperation: Transfer
the right of operation
III. Total Investment of the Project:
RMB 1.05 billion Yuan, equivalent to USD 0.13 billion (one US
dollar for eight RMB Yuan). The value of the right of toll collection
and operation is to be further assessed.
IV. The Expected Period for Recovery of
Investment: 28 years
|