|
I. A Survey
of the Project: Jilin-Caoshi (Jilin-Liaoning border) Expressway
is an important section of Jilin-Shenyang line within the border
of Jilin Province and it is a section of Hunchun-Ulan Hot National
Expressway. Jilin-Caoshi Expressway is the route to Shanhai Pass
and to the sea from the central and east areas of our province
and some areas of Heilongjiang Province. The construction of this
project is vital to the integration of the economy in the Northeast
and to the revitalization of the old industrial bases in Jilin
Province. The total length of the expressway is 226 kilometers
and it will be built into a standard four-lane expressway. By
now, the Preparatory Feasibility Report of the project has been
submitted to the National Development and Reform Committee and
the Ministry of Traffic for approval. The period of construction
is from 2007 to 2010.
II. Mode of Cooperation: BOT, joint
venture, cooperation, etc.
III. Total Investment of the Project: RMB
9.2 billion Yuan, equivalent to USD 1.15 billion (one US dollar
for eight RMB Yuan).
IV. The Expected Profit: 6.64% FIRR;
3,456,230,000 Yuan FNPV; 1.4 FBCR; the period of investment recovery:
20 years.
|