|
I. A Survey
of the Project: Fusong-Gangshanling Expressway is an important
section of Hegang-Dalian National Expressway. It is the route
from the east part of the Northeast to the sea through Dadong
Port in Dandong and Dalian Port. The construction of this expressway
is very meaningful for developing the natural and tourist resources
along the line, accelerating the development and opening, facilitating
the integration of the economy in the Northeast, and revitalizing
the old industrial bases of the Northeast. The total length of
the expressway is 195 kilometers. It is to be built into a standard
four-lane expressway. The period of construction is from 2007
to 2010. The Preparatory Feasibility Report is being compiled.
II. Mode of Cooperation: joint venture,
cooperation, BOT, etc.
III. Total Investment of the Project:
The estimated investment is RMB 11 billion Yuan, equivalent to
USD 1.375 billion (one US dollar for eight RMB Yuan)
|